FD30 & FD60 Certified Supply & Fit

Fire Door Installation

Professional supply and installation of certified FD30 and FD60 fire doors across residential, commercial, and mixed-use developments — fitted to manufacturer specifications by our BM TRADA-certified team.

BAFE Registered BM TRADA BS 8214 Compliant Nationwide Coverage

What Is a Fire Door Installation?

A fire door is only as good as its installation. Even a certified, high-quality fire door will fail to perform if it is incorrectly hung, fitted with the wrong hardware, or installed into a non-compliant frame. Our team installs fire doors to the exact specifications required by BS 8214 and the door manufacturer's installation guide — ensuring every door is certified, documented, and ready for inspection.

🚪

FD30 & FD60 Supply

We supply and install 30-minute and 60-minute rated fire doors from leading certified manufacturers to suit your specification.

🔩

Certified Hardware

All installations include fire-rated hinges, closers, intumescent seals, and smoke seals — fitted to manufacturer specifications.

📋

Installation Certification

Full third-party installation records and certification issued on completion, suitable for building safety cases.

BM TRADA Certified Installers

Every installation is carried out by our BM TRADA Q-Mark certified team — the UK's gold standard for fire door installation.

What Our Installation Covers

Door Specification

Selection of the correct fire door specification (FD30/FD60) for the application and risk level.

Frame Assessment

Assessment of the existing frame or supply of a new certified fire door frame where required.

Certified Door Supply

Supply of a third-party certified fire door from an approved manufacturer.

Correct Hanging

Installation to manufacturer specification with correct gap tolerances (2–4mm) on all sides.

Fire-Rated Hinges

Fitting of the correct number and grade of CE-marked, fire-rated hinges.

Intumescent & Smoke Seals

Installation of intumescent strips and cold smoke seals around the full door perimeter.

Self-Closing Device

Fitting of a compliant, correctly adjusted self-closing device.

Ironmongery & Glazing

Installation of all fire-rated ironmongery and any required fire-rated glazing.

Certification Label & Documentation

Fitting of the certification label and issue of full installation records.

Sectors We Serve

Housing Associations Residential Blocks Commercial Offices New Developments Care Homes Hotels & Hospitality Schools & Colleges Property Managers

Key Regulatory Requirements

The following legislation governs fire door installation frequency and requirements in England and Wales. Non-compliance can result in enforcement action, prosecution, and significant liability.

  • BS 8214:2016 — the British Standard for timber-based fire door assemblies — governs all installation requirements

  • Approved Document B — Building Regulations guidance requiring fire doors in specific locations throughout buildings

  • Building Safety Act 2022 — introduces stricter accountability for fire door installation in higher-risk buildings

  • CE/UKCA Marking — all fire doors and hardware must carry appropriate conformity marking confirming fire performance

Our Simple 4-Step Process

Getting your fire door installation arranged is straightforward with LF Property Solutions. From first contact to final report, we keep things clear, efficient, and fully documented.

  1. 01

    Get in Touch

    Call or email us. Tell us about your property and requirements — we'll respond quickly with no fuss.

  2. 02

    Site Survey & Quote

    We visit your property, carry out a preliminary assessment, and provide a clear, itemised quote. No jargon, no hidden extras.

  3. 03

    Works Carried Out

    Our BM TRADA-certified team carries out all fire door installation works safely, efficiently, and to the required standard.

  4. 04

    Report & Sign-Off

    You receive a full compliance report with all documentation — ready for your records, insurers, or building safety case.

6 Reasons to Choose LF Property Solutions

01

Qualified & Registered

BAFE-registered and BM TRADA certified — complete confidence in every assessment and installation.

02

Nationwide Coverage

Based in Birmingham, working across the whole of the UK. We come to you.

03

Detailed Compliance Reports

Thorough written reports with photographic evidence, ready for records, insurers, or safety cases.

04

Transparent Pricing

Clear, competitive pricing upfront. No hidden charges, no vague quotes — ever.

05

End-to-End Service

One trusted partner from survey through to sign-off. No juggling multiple contractors.

06

Fast Turnaround

Prompt scheduling, clear communication, and fast response times — no chasing required.

Frequently Asked Questions

FD30 fire doors provide 30 minutes of fire resistance; FD60 doors provide 60 minutes. The specification required depends on the building type, the location of the door, and the requirements of Approved Document B and your fire risk assessment.
Yes. We supply certified fire doors from approved manufacturers and install them — providing a single point of responsibility for supply, installation, and certification.
A standard fire door installation typically takes 1–3 hours per door depending on the complexity of the frame and any associated works. We can provide a more accurate timescale once we have assessed the site.
Yes. We regularly work in occupied residential blocks, commercial buildings, and care homes. We plan works to minimise disruption and ensure the building remains safe throughout.
We provide full third-party installation records and certification on completion of all fire door installations, suitable for building safety cases, fire risk assessors, and insurers.
Yes. We work on both new-build developments and refurbishment projects. Our team can work alongside main contractors or directly for building owners and property managers.

Related Services

Ready to Get Started?

Get a free, no-obligation quote for fire door installation today.